Long term water exposure from a leaking vanity and toilet had caused sub floor damage in this project. We repaired the sub floor as needed. The toilet and vanity water lines were re-routed through the walls, since they were originally installed through the sub floor. The soffit over the vanity was removed in order to install a decorative vanity light. We replaced the bathtub, the bathtub water mixer valve, the vanity, the toilet, the bathtub wall tile, the baseboards and the bathroom floor tile. A niche was framed at the bathtub wall. Schluter metal tile trims were used at the outer edges of the left and right walls of the bathtub and around the face of the niche.