In this bathroom we installed the new bathroom floor tile, shower floor tile, shower wall tile and shower curb tile. A niche was framed on the left upper side of the shower water control valve. A new shower water control valve was installed. A new exhaust fan was installed on the bathroom ceiling between the toilet and the shower. A new recessed light was installed on the shower ceiling. A new toilet was installed. The customer is handy so he will install the remaining bathroom fixtures and paint.
Photos of completed project. (click on photos to enlarge)
Photos while the project was being done. (click on photos to enlarge)