This customer had to stop work on his project with another contractor because it wasn't being done right. The shower drain was not centered, the bottom parts of the new Wonderboard cement wall boards in the shower were not straight, the shower curb was not straight and the tile that was installed on the bathroom floor was not installed correctly. We had to remove the bottom Wonderboard cement wall boards around the shower walls and the upper Wonderboard cement wall board on the left wall were the shower control valve is. We removed the entire shower floor down to the shower liner. We centered the shower drain and straightened the shower curb. We installed a new shower liner. We installed the Durock cement wall boards correctly and installed RedGard on the Durock cement wall boards. We also removed the bathroom floor tile. We installed all the tile, the toilet, the vanity, vanity light and medicine cabinet. The customer painted and had a custom glass shower enclosure installed after we finished.
Photos of completed project. (click on photos to enlarge)
Photos while the project was being done. (click on photo to enlarge)